Water Treatment

Print
Press Enter to show all options, press Tab go to next option
 Steve Hartwig, Deputy Director, Public Works
 Steve Moore, Water System Manager
 Phone: (707) 258-1269 Fax: (707) 265-9246

 

The Water Treatment Division operates a Water Plant near Highway 12 (Jamieson Canyon Road) to produce drinking water that meets the highest quality standards set by state and federal regulations.  The main source for our water supply is the State Water Project through the North Bay Aqueduct.  During the peak irrigation season, we supplement our supply as needed with treated water from the cities of Napa and Vallejo. 

There are two treatment processes at the Water Plant:  a conventional sedimentation and filtration treatment process that has been in use since 1976, and a second, state-of-the-art membrane filtration process which was added in 2004.  Together the two processes produce up to 5.5 million gallons of potable water each day for American Canyon and its broader service area.  Crews also maintain pump stations and three water storage tanks.  Construction of two more storage tanks will be underway in the next few years.   

2015 Water Quality Report 

State Water Resource Control Board Water Supply Stress Test - Three Year Continued Drought

Urban Water Management Plan

 Recycled Water Master Plan

 

Potable Water Master Plan

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer